Limerick Main Drainage

PROJECT DETAILS

Client: Limerick City Council
Location: Limerick, Ireland
Value: €200 Million +
Scope: Stage (i) to (v) including PSDP

SHARE

PROJECT DESCRIPTION

Supervision of construction and Operation and Maintenance period for Irelands 3rd largest city (first phase design population of 130,000 P.E). The scheme comprised 5 separate works contracts executed concurrently. This project involved the construction of:

  • 48km of Interceptor Sewers through-out the city up to 2700mm diameter, including 10km of trenchless pipelines
  • 130,000 PE Wastewater Treatment Plant
  • Sludge treatment plant of capacity 156,000 P.E
  • A 2.7m diameter precast segmental tunnel, 2.58km in length, with 12 No. Access shafts constructed at 13 m depth
  • 7.5km of trenchless construction for interceptor sewers up to 1800m diameter
  • Construction of Main Lift Pumping Station, capacity 13.6m³/sec, comprising 5 horizontally mounted centrifugal dry well pumps
  • Outfall Pipeline - 1100mm diameter to Shannon River Estuary including jetty structure
  • 4 River Crossings

All of the above services have been completed, however J. B. Barry and Partners continue to provide Operation & Maintenance services to Limerick City Council on this Project.

The Project was awarded the 2006 Association of Consulting Engineers Presidents Award for Excellence in design.